WSRC-MS-2002-00577

Highly Selective Nuclide Removal from the
R-Reactor Disassembly Basin at the SRS

John B. Pickett
Westinghouse Savannah River Company
Aiken, SC 29808

Jagdish Malhotra
National Energy Technology Laboratory
Morgantown, WA26507-0880

This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U.S. Department of Energy.

DISCLAIMER

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

This report has been reproduced directly from the best available copy.

Available for sale to the public, in paper, from:  U.S. Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161,  phone: (800) 553-6847,  fax: (703) 605-6900,  email:  orders@ntis.fedworld.gov   online ordering:  http://www.ntis.gov/help/index.asp

Available electronically at  http://www.osti.gov/bridge

Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy, Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831-0062,  phone: (865 ) 576-8401,  fax: (865) 576-5728,  email:  reports@adonis.osti.gov

Abstract

This paper describes the results of a deployment of highly selective ion-exchange resin technologies for the in-situ removal of Cs-137 and Sr-90 from the Savannah River Site (SRS) R-Reactor Disassembly Basin. The deployment was supported by the DOE Office of Science and Technology’s (OST, EM-50) National Engineering Technology Laboratory (NETL), as a part of an Accelerated Site Technology Deployment (ASTD) project. The Facilities Decontamination and Decommissioning (FDD) Program at the SRS conducted this deployment as a part of an overall program to deactivate three of the site's five reactor disassembly basins.

The R-Reactor was shutdown in 1964, and is currently maintained in a Surveillance and Maintenance (S&M) mode. The disassembly basin still contains the majority of the water left at shutdown, currently about 5,000,000 gallons. The ASTD deployment was designed to remove the majority of the Cs-137 and Sr-90, using highly nuclide specific ion-exchange resins. The use of highly specific resins would generate the least amount of secondary waste, by removing only the constituents of concern. The treatment was conducted in-situ, with the treated effluent discharged back into the basin. The goal was to treat one to two basin volumes of water, and to remove 67% to 73% of each of the radionuclides. At that point, the water could be treated one final time, which would meet the DOE release limits (and perhaps the EPA drinking water limits) and be released directly to a surface stream. Even if the water were not released, treatment of the basin water would reduce the impact to the surrounding groundwater, if the basin were to leak in the near future.

The deployments utilized two technologies for Cs-137 removal. One was a system from the 3M Co., St. Paul, MN (the Selective Separation Cartridge- SSC™) and a commercial water softening resin from Graver Technologies, Glasgow, DE. The 3M SSC™ system for Cs-137 removal treated over 6.8 million gallons of the basin water, or approximately 1.3 basin "turnovers" at 98 to 99% removal efficiency. The Selion CsTreat® system treated an additional 1.2 million gallons for Cs-137, at 97 to 99% removal efficiency. The Sr-90 deployment system treated over 5.6 million gallons at greater than 99.9% removal efficiency. Over 75% of both radionuclides were removed from the R-Disassembly basin water by the completion of the deployments.

I. Introduction

The 105-R Reactor Disassembly Basin is a concrete structure of blast-resistant design connected to the west side of the reactor building. The R-Reactor Disassembly Basin is the largest of the SRS production reactor basins, encompassing over 40,000 square feet, with a capacity up to ~6.3 million gallons. Reactor operations were initiated in 1953 and the reactor and disassembly basin were retired from service in 1964.

The disassembly basin has been emptied of all fuel (fissile) and target materials. Although no basin management is currently being performed, about 5 million gallons of water remains in the basin, about 6 feet below normal full. The basin water contains approximately 750 curies of radioactivity, primarily tritium. The potential exists for leakage of the basin water to the surrounding groundwater. This would result in immediate groundwater contamination, since the water table is close to the same level as the water in the basin (~5 feet to 8 feet below ground surface). The basin water contains Cs-137 and Sr-90, at levels which would exceed EPA drinking water levels, if the basin water mixed with the groundwater.

In FY ‘99, the DOE Office of Science and Technology (OST, EM-50) approved a Deployment Plan for the water cleanup at the 105-R Disassembly Basin and provided funding amounting to $550,000 through FY 2001. FDD provided matching funding through EM-60 of $950,000 for these three years. The Deployment Plan, SR-09-DD-61, called for the use of a highly selective NUclide REmoval System (NURES) commercialized by Selion, OY, Finland. Graver Technologies Inc., of Glasgow DE, licensed the NURES technology from Selion, and provided the NURES selective resins and equipment to the SRS.

In FY 2000, FDD also partnered with 3M, St. Paul, MN to deploy a similar highly selective material for Cs-137 at the R-Disassembly Basin. This technology is called the Selective Separation Cartridge (SSC™) technology. The 3M system was developed under a DOE Technical Task Plan FT-06-C-261, overseen by DOE's National Energy Technology Laboratory, Morgantown, WV, who provided the funding for the construction of the 3M system. FDD funded the 3M system deployment costs at the disassembly basin. Neither the Selion, nor the 3M, ion-exchange technologies had been previously deployed at a Department of Energy site. The 3M Cs removal system had been tested at the R-Disassembly Basin in 1998 at 5 gpm for a short period of time (2 weeks).

The SRS Technical Task Plan (TTP) goals for the removal of Cs and Sr are summarized in Table I. At the completion of the recycle mode, - with one more pass at 90% efficiency - the treated water would meet the DOE release guidelines. If the ion-exchange removal efficiency exceeded 99%, the final treated effluent would meet the EPA guidelines.

Table I TTP Treatment Goals for the In-Situ R-Basin Deployments
 

Initial Radionuclide
Concentration,
pCi/L

Deployment Goal
During Recycle,
pCi/L

DOE 5400.5
Release Guide,
pCi/L

EPA Primary
Drinking Limit,
pCi/L

Cs-137

92,800

25,000 (73%)

3,000

200

Sr-90

23,400

10,000 (67%)

1,000

8


II System Descriptions

II.A. Selion CsTreat® for Cs-137

The Selion CsTreat® technology is based on a deep bed ion-exchange technique, using very finely divided hexacyannoferrate, with a very high surface area. The bed is operated in a down–flow mode, with preferred flow rates in the range of 10 to 20 bed volumes per hour (BV/hr). At that flow rate, the CsTreat®’s anticipated removal efficiency is greater than 99.9% (a DF; Decontamination Factor of >1,000). The system for the R- Disassembly basin was initially designed to treat 50 gallons/min (3000 gallons/hr, or 400 cu. ft/hr). At 20 bed volumes per hour, his would have required 20 cubic feet of resin. This proved to be too expensive for the available ASTD deployment funding, since the CsTreat® costs ~$16,000 per cu. ft. In order to meet the deployment goals, the target flow rate was reduced to 15 to 20 gpm (~160 cu. ft/hr), and the flow rate was increased to 50 BV/hour. This allowed the use of only ~3 cu. ft of CsTreat®, at a cost of ~$48,000.

II.B 3M Selective Separation Cartridge® (SSC™) for Cs-137

Since the original deployment goal of 50 gpm could not be accomplished with the down-sized Selion system, FDD partnered with the 3M Co., St. Paul, MN to deploy 3M’s highly selective Cs-removal system. The 3M system could be also operated at 15-20 gpm. The 3M cartridge membrane is trademarked Selective Separation Cartridge® (SSC™) The high surface area sorbent particles are loaded or enmeshed onto a web or membrane, which is then fabricated into a spiral-wound, cartridge-filter. The R-basin deployment used 22 cylindrical cartridges, 2.3" in diameter by 21" in length, at a total cost of $60,000. The 3M cartridge technology can provide higher flow rates than a standard packed bed system, and channeling is not a concern for the cartridge technology.

The colbalti-hexacyanoferrate forms an insoluble precipitate with cesium, therefore it was not intended to be regenerated; rather both the 3M and Selion materials will be disposed as low level radioactive waste (LLRW).

II.C. Selion Sr-90 Removal System

The Selion ion-exchange system for Sr-90 is based on a sodium titanium oxide, again with a very small particle size and high surface area. Prior to the system deployment, Selion determined in tests (with simulated R-basin water), that two of the major cations present in the basin water, Ca (at 13 mg/L), and Mg (at 0.5 mg/L) would interfere strongly with strontium-90 removal. Therefore, it was decided to "pre-treat" the basin water with a conventional water softening resin, "GRAVEX® GX–080." This resin is a sulfonated styrene and divinylbenzene strong acid exchange resin, produced by Graver Technologies, DE. The plan was to use the Gravex® water softening resin to remove the majority of the Ca and Mg in the water, prior to a final treatment with the SrTreat®. However, there was insufficient time to utilize the SrTreat® at the end the Ca/Mg pretreatment, so the SrTreat® was not deployed. Twelve 100-gallon tanks containing the water softening GRAVEX® GX–080 resin were not regenerated; they were disposed as LLRW.

II.D. 3M Strontium Removal (SSC®) Cartridge System

The 3M strontium selective removal system was based on a sulfonated divinylbenzene compound, similar to Graver’s water softening resin. As with the SrTreat®, calcium and magnesium also compete strongly with Sr-90 removal for the 3M material. Two sets (22 cartridges per set) of the 3M Sr-90 removal cartridges were tested in the R-Basin in June 2000, at 20 gallons per minute. Initial Sr-90 removal during the first 5,000 gallons treated was greater than 99% (DF >100). After this point, Ca and Mg started to saturate the available exchange sites, and 50% breakthrough for Sr-90 occurred at ~12,000 gallons on both sets of filters. The concentration of Ca was ~13 mg/L, while the concentration of natural strontium was 0.15 mg/L in the basin water, a factor of about 100. The 3M cartridges did not demonstrate a high enough selectivity for strontium vs. Ca/Mg for the R-Basin deployment, so no further testing was conducted with the 3M SSC® Sr-90 cartridge removal system.

III. System Operation and Performance

III.A. General Operations

Both of the cesium and strontium systems were operated in a "recycle" mode, i.e.; treated water was discharged back into the basin. The discharge locations were re-positioned such that untreated water was "swept-back" toward the intake from the farthest distance in the basin. If the treated water did not mix with the untreated water, all of the water could be treated in one pass, i.e.; this would be similar to "plug flow". If the treated water mixed uniformly with the untreated water, then the whole basin system would be similar to a "continuously stirred tank reactor" (CSTR). By placing the discharge of the treated water at the farthest basin walls, with the water intake near the center of the basin, untreated water was "swept back" to the intake. This resulted in less mixing and in a treatment rate greater than that of a CSTR. This allowed the TTP treatment goals (Table I) to be met without treating as many basin turnovers as were anticipated based on complete mixing. The final results are shown in Table III.

Table II Cs and Sr Removal
 

Gallons
Treated

Basin
Volumes

% Removal
if CSTR

Actual %
Removal

Final pCi/L
Initial pCi/L

Cs-137

8,000,000

1.60

78%

89%

~10,000/ 92,800

Sr-90

5,627,000

1.12

64%

74%;

~6,000/ 23,4000

Treating the basin water by the recycle mode allowed the lowest possible in-situ treatment costs. Utilizing the discharge re-positioning technique allowed the goal to be attained with as few basin turnovers as possiblle.

III.B. Graver/Selion, CsTreat® Operations

Initial start-up of the CsTreat® system in the R-basin occurred 7/28/00. Initial start-up of the CsTreat® media encountered a very high-pressure drop across the CsTreat®; 84-88 psi at a flow rate of 12.7 gpm. Consultation with Selion, OY suggested that the CsTreat® media might have significant fines which were causing the high delta P (pressure drop), and that back-flushing might solve the problem. This proved to be the case; after back-flushing 3 times, the delta P dropped to 30 psi at 14.6 gpm.

After the initial start-up, the system started operating continuously on 8/16/01. The pressure drop across the CsTreat® was acceptable at 30 psi, at 17.5 gpm. The 1 micron pre-filters started with a delta P of 4-5 psi, but their delta P increased to 37 psi after ~200,000 gallons had been treated. At that point the delta P across the 1-micron filters leveled out, and then started to diminish. It was not recognized until later that the 1-micron pre-filters had "broken-through" and were allowing particulates to plug the CsTreat® media. By that time (9/28/01), the delta P across the CsTreat® had increased to 36 psi, at a reduced flow rate of 13 gpm. We then started replacing the 1-micron filters on a 10-day frequency, about every 100,000 gallons of water treated. However, the delta P across the CsTreat® continued to increase until it reached 57 psi at only 10 gpm. Including the pressure drop across the 1-micron filters, the total system was operating at a delta P of 75-85 psi, and we had a small leak at one of the quick-disconnect couplings.

We considered back-flushing the CsTreat® to reduce the pressure drop and increase flow rate, but the 1-micron filter replacement rate was too high to be supported. Therefore, at 1,189,000 gallons treated, on 11/30/00, the Graver/Selion CsTreat® system was shutdown.

III.C. 3M SSC ™ Cs-137 Operations

The SSC™ system for the selective removal of Cs-137 was started up 6/21/00. The system had a 65 gpm centrifugal pump. It had one 2-micron pre-filter, followed by a set of nine 0.2- micron pre-filters, prior to the 22 SSC™ cartridges. From 6/26/00 to 9/13/01, the system was "down" only for change-out of the 3M™ 2-micron and 0.2-micron pre-filters. The initial 8 weeks of operation were considered a "demonstration" of the new technology. The demonstration was completed 8/17/00, with 1.1 million gallons treated. The 3M system continued to be operated, so that the total treatment rate of both the 3M SSC™ system and the Graver/Selion CsTreat® system (when it started later, in July, ‘00) was 40 to 50 gpm.

After 10 months of 3M operations, and 3 months of Graver/Selion operations for Cs-137 removal, a total metals analysis was conducted on a basin water sample. The concentrations of aluminum, iron, copper, manganese, and nickel were each reduced by approximately 90% vs. the pre-treatment concentrations in 1997 (see Table IV). Since these heavy metals can form slightly insoluble hydroxides/oxides, their removal is attributed to the 3M 2-and 0.2-micron pre-filters and the Graver 1-micron pre-filters. The combination of the 3M 2- and 0.2-micron filters allowed very low solids to impact the 3M SSC™ cartridges. The SSC™ cartridges evidenced almost no pressure drop increase during the entire 6.8 million gallons treated (zero to ~2 psi delta P).

Table IV Metal Concentrations, mg/L

Composite
Sample,
1997

Inlet
Sample
4/19/01

Graver, Sr
Lag Tank
4/30/01

Graver, Sr
Lead Tank
5/7/01

Gallons
Treated

Zero
(Ref. 1)

5,765,000
Total

160,000

315,000

Al

0.103

<0.015

<0.015

-

B

0.029

0.012

0.007

-

Ba

0.005

0.005

<0.003

-

Ca

12.2

11.98

0.132

6.77

Cd

<0.001

<0.002

<0.002

-

Co

0.007

0.006

<0.003

-

Cr

0.002

<0.009

<0.009

-

Cu

0.084

<0.003

<0.003

-

Fe

0.116

0.008

0.005

-

Li

-

0.024

0.028

-

Mg

0.49

0.45

0.009

0.99

Mn

0.027

<0.001

0.003

-

Mo

0.001

<0.003

<0.003

-

Na

16.5

17.7

54.4

-

Ni

0.059

<0.009

<0.009

-

Pb

<1.0

<0.046

<0.046

-

Si

1.32

1.19

1.18

-

Sn

<1.0

0.029

0.025

-

Sr

0.150

0.164

<0.001

<0.001

Ti

0.001

<0.003

<0.001

-

V

0.033

<0.003

<0.003

-

Zn

0.015

0.009

0.036

-

III.D. Graver Sr-90 Operations

The Graver/Selion Sr-90 removal system was started-up 4/16/01. Two 100-gallon Sr-90 removal tanks were used in series, a "Lead" and a "Lag" tank. As each lead tank reached its capacity for calcium and strontium, it was removed and replaced with a fresh tank. The pressure drop across both the lead and lag tanks - combined - never exceeded 28- 30 psi, at flow rates up to 30 to 32.5 gallons per minute. At a flow rate of 32.5 gpm (~47,000 gallons/day), a one basin volume turnover was accomplished 10/8/01, when 5,627,000 gallons had been treated. Since the funding for this deployment only included fiscal years ’99, ’00, and ’01 – the SrTreat® material could not be deployed. However, the GRAVEX–080® resin removed Sr-90 much more effectively than anticipated, and the final Sr-90 per cent removal goals were attained.

IV. Results and Discussion

IV.A. 3M and Graver/Selion Cs-137 Removal

The results for the Cs-137 removal by both systems are given in Table V. The 3M system always removed Cs-137 at >97%, usually >99%. The Selion CsTreat® % removal was similar, ranging from 97% to 99%. The goal of <25,000 pCi/L of Cs-137 was attained by 3/26/01, after which no analysis was greater than 23,000 pCi/L Cs-137.

Table V Cs-137 Results, pCi/L

Date

3M, Gals
Treated
(1000s)

3M
in
pCi/L

3M
out
pCi/L

%
rem.’

Selion, Gals
Treated
(1000’s)

Selion
In
pCi/L

Selion
Out
pCi/L

%
Removal

6/22/00

22

78,195

<1392

-

-
-
-
-

6/29/00

101

80,982

<1644

-

-
-
-
-

7/13/00

493

66,933

120

99.8

-

-

-

-

8/7/00

845

50,406

758

98.5

1

59,500

108

99.8

8/17/00

1,093

90,060

148

99.8

32

35,344

739

97.9

9/11/00*

1,435

29,230

802

97.3

465

32,730

875

97.3

11/2/00

1,869

64,810

118

99.8

-

-

-

-

11/9/00*

2,058

51,213

177

99.7

1,158

55,628

648

98.8

11/21/00

2,302

69,932

235

99.7

-

-

-

-

11/30/00

2,434

27,937

<413

>98.5

-

-

-

3/26/01#

4,188

20,188

<334

>98.3

-

-

-

-

4/19/01

4,575

22,992

<102

>99.5

-

21,334@

-

-

5/14/01##

4,957

19,028

48

99.7

-

13,662

433

96.8

5/31/01

5,204

19,781

78

99.6

-

-

-

-

6/25/01

-

-

-

-

-

13,032

15,246

-

7/2/01

5,750

16,320

<69

>99.6

-

-

-

-

8/20/01

6,494

15,454

104

99.3

-

-

-

-

9/13/01

6,813

12,391

123

99.0

-

8,501

-

-

* Moved 3M discharge toward far southeast corner, then all the way to the corner; the intake concentration increased after each move, as untreated water "swept" back

# Moved 3M discharge to far southwest corner

## Moved 3M discharge to far northwest corner

@ Graver Sr removal system operating; discharging to far northeast corner of the basin. Note: the 5/14/01 analysis indicated Cs-137 removal, while the 6/25/01 analysis indicated Cs-137 stripping.

IV.B. Graver/Selion Sr-90 Removal

The Sr-90 removal results are summarized in Table VI. The % removal for Sr-90 with both the lead and lag tank in series was never below 99.5%. The % removal for the lead tank for Sr-90 went as low as ~85 %, when the total volume of water was over 600,000 gallons. The Sr-90 removal far exceeded the expectation that only 150,000 gallons could be treated per tank, before Sr-90 breakthrough. The GRAVEX-080® resin was found to be selective for Sr-90 in the presence of Ca and Mg at 100 fold the concentration of natural strontium.

Table VI Sr-90 Results, pCi/L

Date

Lead
Gallons
(1000)

Lag
Gallons
(1000)

Lead
In
pCi/L

Lead
Out
pCi/L

%
rem.’

Lag
In
pCi/L

Lag
Out
pCi/L

%
Rem.’*

4/19/01

35

35

23,400

-

-

-

<10

<99.95

4/30/01

160

160

23,700

18

>99.9

18

<10

>99.95

5/7/01

315

315

21,600

194

>99.5

-

-

-

5/21/01

275

590

20,600

27

>99.9

27

12.6

99.9

6/11/01

425

1,015

15,800

396

97.4

396

17.5

99.8

6/25/01

446

1,461

4,919

89

98.2

89

23

99.5

7/12/01

551

2,012

5,177

226

95.7

226

21

99.6

8/6/01

625

2,637

8,811

1,354

85.4

1,354

13

99.8

8/20/01

652

0

7,000

1,094

84.3

-

-

-

8/30/01

488

488

6,608

51

99.2

51

23

99.6

9/10/01

532

1,020

5,602

26

99.5

26

12

99.8

10/8/01

1,318

2,338

3,974

2,416

38

2,416

12

99.7

* The % removal is for both the lead and lag tank combined.

IV. Summary

Both the 3M and Graver/Selion systems were highly effective at removing Cs-137. The Selion CsTreat® is more sensitive to particulate plugging than the 3M SSC cartridge technology. The 3M SSC® filter cartridges can be used at higher flow rates than the Selion CsTreat®, which is limited by the bed volumes/hr it can treat. The Selion system would work very well at high Cs-137 concentrations and low flows, while the 3M system will work more effectively at low Cs-137 concentrations and high flow rates.

The "Gravex 080®" resin was shown to be moderately selective for Sr-90 in the presence of Ca and Mg. This allowed the resin tanks to continue to be utilized even after they were saturated with respect to Ca and Mg.

The in-situ approach demonstrated a new and innovative water treatment technology for these radionuclides. The selective and highly efficient ion exchange media removed Cs-137 from the R-Reactor Disassembly Basin water with drastically reduced radiological waste volumes. The innovative in-site technologies saved the DOE an estimated $4 to $5 million at the R-Disassembly Basin compared to conventional baseline technology (transport to and treatment at a centralized wastewater treatment facility).

References

  1. J. B. PICKETT, Analytical Results of the 1997 R-Reactor Disassembly Basin Sampling Program, FDD-ENG-98-0029, Westinghouse Savannah River Co., Aiken, SC 29808, 4/1/98.